What a keying schedule is
A keying schedule is a document that lists every lockable door in a building and records which keys operate each lock. It also defines the key hierarchy: which keys open single doors, which open groups of doors, and which open everything.
Contractors need it to order and install door hardware correctly. Owners and facility managers need it to control who can get into which rooms, and to keep the system working when staff change or keys go missing.
Keying schedule vs hardware schedule vs bitting list
These three documents are often confused, but each has a different job:
| Document | What it records | Who uses it |
|---|---|---|
| Hardware schedule | The locks, hinges, closers and other hardware on each door | Architect, contractor, installer |
| Keying schedule | Which keys open each lock, and how the keys relate to each other | Owner, contractor, hardware supplier |
| Bitting list | The exact cut depths of every key in the system | Keying specialist only (confidential) |
Keep the bitting list private. Anyone with the bitting list can cut keys for the whole building. Store it separately from the keying schedule and share it only with people you authorize.
Key levels and key symbols
Most commercial buildings use a master key system, where higher-level keys open everything below them. Each key gets a short key symbol so the schedule stays readable. A typical hierarchy looks like this:
| Level | Example symbol | What it opens |
|---|---|---|
| Grand master | GM | Every door in the system |
| Master | A, B, C | A group of doors, such as one floor or department |
| Sub-master | AA, AB | A smaller group within a master group |
| Change key | AA1, AA2 | One door, or a few doors keyed alike |
| Restricted (independent) | X1 | A door kept outside the master system, such as a server or cash room |
Symbols follow a pattern: the letters show which group a key belongs to and the number shows the individual key. Many manufacturers recommend avoiding the letters I, O and Q in symbols because they are easily confused with 1 and 0.
How to create a keying schedule in 7 steps
- List every door. Use the door numbers from the drawings or hardware schedule. Record room name, floor and whether the door is interior or exterior.
- Choose a lock function for each door. Typical functions are office, classroom, storeroom, entrance and passage (no key). The function decides how the lock behaves, so get it right before keying.
- Map who needs access. Describe groups and roles, not names: "Floor 2 staff", "IT team", "cleaning crew", "Tenant A". Roles last longer than people.
- Design the key hierarchy. Decide the levels you need. Give each group of doors a master, each door a change key, and keep high-risk rooms on restricted keys outside the master system.
- Assign key symbols. Give every key a symbol and mark, for each door, which keys open it. This "opened by" column is the heart of the schedule.
- Plan quantities and growth. Set how many of each key to cut, and leave room for future doors, new departments and extra buildings. A system that cannot grow will need a costly rekey later.
- Review and sign off. Check the schedule against the drawings and, for existing buildings, a site survey. Get the owner to approve it before any cylinders are pinned.
Want a head start? Our free keying schedule template has the columns for steps 1 to 3 ready to fill in.
Keying schedule example
Here is a short example for a two-floor office. The grand master (GM) opens every door. Master A covers floor 1, master B covers floor 2, and the IT room sits outside the master system on its own key.
| Door | Room | Function | Key set | Opened by |
|---|---|---|---|---|
| 101 | Main entry | Entrance | AA | GM, A, AA |
| 102 | Office | Office | AA1 | GM, A, AA1 |
| 103 | IT room | Storeroom | X1 | X1 only |
| 201 | Office | Office | AB1 | GM, B, AB1 |
| 202 | Janitor | Storeroom | AB2 | GM, B, AB2 |
Notice that the IT room is not opened by the grand master. Leaving a sensitive room out of the master system means a lost grand master key cannot open it.
Common mistakes to avoid
- Too many grand master keys. Every extra copy increases the risk. Issue them to as few people as possible.
- No room to grow. Designing only for today's doors forces a rekey when the building expands.
- Naming people instead of roles. Staff leave; roles stay. Build access around roles.
- Mismatched documents. If the keying schedule, hardware schedule and purchase order disagree, the order gets delayed. Check them against each other.
- Losing the records. Without an up-to-date schedule, nobody knows which key opens which door. Keep it current every time a key is added or changed.
Frequently asked questions
Who prepares the keying schedule?
On new construction it is usually prepared by the door hardware supplier or a keying specialist, then approved by the building owner. For existing buildings, the facility manager often works with a locksmith or keying specialist.
Is a keying schedule the same as a hardware schedule?
No. A hardware schedule lists the locks, hinges and closers on each door. A keying schedule shows which keys operate each lock and how the keys relate to each other.
What is a bitting list?
A bitting list records the actual cut depths for every key in the system. It is confidential and should be kept separately from the keying schedule and shared only with authorized people.
How long does it take to make a keying schedule?
A small building can be scheduled in a few days once the door list and access needs are known. Large or multi-building systems take longer because more people must agree on access.